Kitting & Fulfillment Quote Widget

What a kitted box actually costs to assemble, before you quote it as "a few bucks each."

Kitting gets quoted by feel more than any other service in this industry. Someone says "three bucks a kit" because that sounds about right, and then a person spends nine hours assembling 200 boxes and nobody ever measures what that cost.

This breaks a kit into the four things that actually cost money: labor, packaging materials, project setup, and storage. Time one kit with a stopwatch, put the real number in, and the arithmetic will tell you whether your gut price was close.

Free tool · nothing saved

Price the kit

Time one real kit with a stopwatch before you use this. The guess is always low.

The project

kits
5

Used for the sanity check on your assembly time, not for the price.

Assembly labor

min

Assemble three kits, average them, then add a little for the ones that go wrong.

$/hr

Packaging materials per kit

$
$
$
$
$/kit

One-time and storage

$total

Kit spec, first article, receiving and counting inbound product, address list cleanup.

$

Shipping and margin

40%
Sell price per kit
$9.21

$2,302.78 for the project, $921.11 gross profit

Your cost per kit
$5.53

Labor, materials, setup, storage

Assembly hours
10.4 hrs

30 seconds per item at your stated pace

Per-kit cost stack

Assembly labor (21.1 percent of cost)$1.17
Packaging materials (43.4 percent)$2.40
Setup + storage, spread per kit$1.96
Total cost per kit$5.53

Project fixed costs

Project setup$350.00
Storage (2 pallets x 2 months)$140.00

If labor is under a third of your cost per kit, check your assembly time again. It is the number people guess and the number that decides whether a kitting program makes money.

Labor rate should be fully loaded (wage plus payroll burden), not the hourly wage. Setup and storage are spread across the kit count, which is why small kit projects cost more per unit than anyone expects.

How the math works

Labor

Assembly time per kit times your fully loaded labor rate. Fully loaded means wage plus payroll burden, not the hourly wage on the offer letter. If you have never timed a kit, assemble three and average them, then add a little for the ones that go wrong.

Materials

Box, filler, insert card, poly bags, tape, and shipping label. Individually trivial, collectively often more than the labor. This is the line most gut quotes miss entirely.

Project setup

One-time work: kit spec, first article, receiving and counting inbound product, and the address list cleanup nobody budgets for. Spread across the kit count, it is the reason 50-kit projects are not cheap.

Storage

Pallets times monthly rate times months held. If product sits for a quarter before it ships, that is real warehouse cost, and it belongs in the quote rather than in a surprise conversation later.

Shipping

Kept as its own line because it is usually quoted separately or passed through. Toggle it in to see the true landed cost per kit.

The production version

Kitting & Fulfillment Suite

Live in production

Price kitting from a rate card instead of a guess.

Proof: Kitting quotes stopped being a negotiation with my own memory; the warehouse can bill what the floor actually holds.

Questions, answered

For simple three-to-five-item kits, labor commonly lands somewhere between one and four minutes per kit once a line is set up, plus materials. But the honest answer is that it depends on your labor rate, packaging, and how fiddly the kit is, which is why this calculator asks for your inputs instead of quoting an average.